• Home
  • >
  • Blogs
  • >
  • Heat Network Metering & Billing Regulations 2026 Changes Explained

Heat Network Metering & Billing Regulations 2026 Changes Explained

Published Date: August 26, 2026

( Last Updated: September 22, 2026 )

The Heat Network (Metering and Billing) Regulations 2014 required heat suppliers to notify their networks and bill final customers based on actual consumption, but from 27 January 2026 the notification duty and billing rules were revoked in England, Scotland and Wales and replaced by Ofgem's authorisation conditions. The duty to install meters, where already determined necessary, still applies. Northern Ireland is unaffected.

This guide explains which of those rules still apply after the January 2026 changes, what Ofgem has replaced, and what it means for meter installation, building classification and billing across Great Britain (GB) and Northern Ireland including the viable and exempt classes, meter maintenance duties, and how compliance ties into Ofgem registration and heat network accounts.

Key Takeaways

  • Heat network metering and billing regulations changed materially on 27 January 2026: the duty to notify, the HCA duty, and the billing rules under the 2014 Regulations were all revoked in Great Britain.
  • The change was made by the Heat Networks (Market Framework) (Great Britain) (Amendment) Regulations 2026 (SI 2026/7), to stop these duties duplicating Ofgem's new authorisation conditions.
  • Meter accuracy (Regulation 5) and meter replacement (Regulation 7) duties were not touched and remain fully in force.
  • The 'Open' building classification no longer functions as an ongoing route to a meter-install duty in Great Britain only Viable-class buildings, and former Open-class buildings with a pre-27 January 2026 positive determination, still require meters.
  • Northern Ireland is entirely unaffected: the original 2014 Regulations, including notification and billing, remain in full force there.

What Is the Heat Network (Metering and Billing) Regulations 2014?

The Heat Network (Metering and Billing) Regulations 2014 (SI 2014/3120) implemented the metering and billing requirements of the EU Energy Efficiency Directive (2012/27/EU), Articles 9 to 11 and 13, into UK law. Their purpose was to ensure heat network customers were billed on actual consumption rather than a flat or estimated charge, in the same way as gas and electricity customers.

Do the Heat Network Metering and Billing Regulations Still Apply in 2026?

Not in full, and not everywhere. From 27 January 2026, the Heat Networks (Market Framework) (Great Britain) (Amendment) Regulations 2026 (SI 2026/7) partially revoked the 2014 Regulations in England, Scotland and Wales. According to DESNZ's February 2026 guidance, this was done specifically to prevent duplicate obligations, now that Ofgem regulates heat networks directly under new authorisation conditions.

The result is a split regime. Some 2014 duties were revoked outright. Some were only partly revoked, with the underlying obligation kept alive. Meter accuracy and meter replacement were left completely untouched. The table below sets out what changed.

Which Obligations Were Revoked From 27 January 2026?

Regulation

What it required

Status from 27 January 2026

Replaced by

Regulation 3

Duty to notify DESNZ of the heat network

Revoked in full

Ofgem registration under authorisation condition A4

Regulation 6

Installation of Heat Cost Allocators (HCAs), thermostatic radiator valves, hot water meters

Revoked in full

No direct replacement. HCAs no longer count as a compliance route

Regulation 9 and Schedule 2

Billing based on actual consumption, minimum billing content

Revoked in full

Ofgem's billing and price transparency conditions (condition B6)

Which Obligations Still Apply?

Regulation

What it required

Status from 27 January 2026

Regulation 4

Duty to install meters

Partially revoked. The cost-effectiveness assessment machinery was removed, but the underlying meter-install duty survives for Viable-class buildings and certain former Open-class buildings

Regulation 5

Meter accuracy

Remains in full force, unchanged

Regulation 7

Replacement of existing meters

Remains in full force, unchanged

Regulation 8

Ongoing meter maintenance

Partially revoked. The HCA element was removed, but the core meter maintenance duty survives

Note that the "Open" class was not deleted from the Regulations' wording. What changed is that the assessment route which gave it legal effect was stripped out, so it no longer functions as a live compliance pathway in Great Britain. A saving provision keeps the meter-install duty alive for buildings that already had a positive determination before the cut-off, which is covered in the next section.

Who Do the Heat Network Metering and Billing Regulations Apply To?

The Regulations distinguish between a district heat network, where a central energy centre supplies multiple buildings, and a communal heating system, where a single building's plant serves multiple flats or units. Both fall within scope.

The party responsible for compliance is the "heat supplier", any person who supplies and charges a "final customer" for heat, cooling or hot water. In practice, this is often the entity responsible for the plant room rather than the party the resident thinks of as their energy supplier: commonly a freeholder, a managing agent acting on the freeholder's behalf, or a resident management company, rather than a conventional gas or electricity supplier.

What Are the Viable, Open and Exempt Building Classes?

The 2020 amendment to the 2014 Regulations introduced a three-class system, tied to a cost-effectiveness assessment, to decide whether individual meters were required in a building:

  • Viable: meters are cost-effective and technically feasible; installation is mandatory.
  • Open: the assessment was inconclusive or borderline; the building had to be reassessed periodically.
  • Exempt: installation is not cost-effective or not technically feasible; no meters required.
After the change, the Open class stopped operating as an ongoing assessment route in Great Britain. There is no longer a mechanism to place a building into Open and reassess it every four years. In practice, Great Britain now runs a two-tier system for new determinations, Viable or Exempt with a closed legacy category for buildings already classified as Open with a positive determination made before the cut-off date.

Class

GB status (post-27 January 2026)

Northern Ireland

Viable

Meters mandatory

Meters mandatory

Open

Revoked as an ongoing class. No new assessments; a legacy positive determination made before 27 January 2026 still requires meter installation

Still live. The cost-effectiveness tool continues to apply

Exempt

No action required

No action required

Northern Ireland retains the original three-class system in full, including live use of the cost-effectiveness assessment tool.

Do the Heat Network Metering and Billing Regulations Apply Differently in Northern Ireland?

Yes. The Ofgem authorisation framework introduced in Great Britain does not extend to Northern Ireland. There, a heat supplier must continue to notify DESNZ under the original 2014 Regulations, install Heat Cost Allocators where required, and bill final customers on actual consumption, exactly as before. A heat supplier operating in Northern Ireland should comply with the 2014 Regulations in full, regardless of what changes on the GB side.

What Happens if a Heat Network Doesn't Comply?

Non-compliance still carries consequences on both sides of the current framework. Failing to maintain meter accuracy under Regulation 5, or failing to replace meters as required under Regulation 7, is a breach of the 2014 Regulations in its own right, regardless of the January 2026 changes. Separately, Ofgem now enforces the areas the 2014 Regulations no longer cover, including registration and billing.

Conclusion

Notification, the Heat Cost Allocator duty and consumption-based billing were not simply dropped from heat network regulation. They were replaced by Ofgem's authorisation conditions, which now sit at the centre of heat network compliance in Great Britain. Notification duties have been superseded by registration with Ofgem under authorisation condition A4. Billing duties have been superseded by Ofgem's billing and price transparency conditions.

Great Britain heat networks must also register with the Energy Ombudsman's Heat Network Supplier redress scheme, separate from Ofgem registration.

This is where Heat Network Metering and Billing Regulation connects directly to your accounts. An Ofgem registration submission depends on cost allocation, billing records and consumption data reconciling cleanly, and gaps here are what typically hold up a submission.

Our Heat Network Accounts service handles that reconciliation and prepares accounts to the standard Ofgem expects.

FAQs

Does a cost-effectiveness assessment still need to be repeated every four years?

Not under the revised Great Britain regime. The four-yearly reassessment cycle was tied to the Open classification, and that route was removed from 27 January 2026. Buildings already classified as Viable or Exempt do not need a fresh assessment under the 2014 Regulations framework. Northern Ireland retains the original four-yearly cycle unchanged.

Can a lease override the metering and billing regulations?

No. The metering and billing duties that remain in force, such as meter accuracy and replacement, are statutory obligations that apply regardless of what a lease says. A lease can set out how costs are apportioned between leaseholders, but it cannot remove a heat supplier's underlying regulatory duties.

What is a Heat Cost Allocator, and why was the duty to install them revoked?

A Heat Cost Allocator (HCA) is a device fitted to a radiator that estimates heat usage without measuring flow directly, used as an alternative to a full heat meter in some buildings. The duty to install HCAs under Regulation 6 was revoked in full from 27 January 2026 as part of removing duplication with Ofgem's new framework. HCAs no longer count as a route to compliance in Great Britain.

Does this affect an Ofgem registration submission or existing heat network accounts?

Yes. The duties this article describes as revoked, notification and billing, are precisely the areas Ofgem's authorisation conditions now cover. A registration submission needs to reflect the current legal position rather than the pre-2026 rules, and heat network accounts prepared for Ofgem scrutiny should be built on the surviving metering duties, not the revoked ones. Our Heat Network Accounts service can review your current position against both frameworks.

UK Property Accountants
Our Complete Guides
File your self assessment
Related Posts

Introducing RentalBux: Our MTD Software for Landlords

Generic software doesn't understand property businesses and require manual intervention to meet deadlines. That's why we developed RentalBux!

  • Built by Property Experts
  • Designed for UK Landlords
  • HMRC Recognised and MTD Compliant

Confused where to start?

Schedule a Free 15-minute discovery call by providing your contact details, mentioning your requirements, and selecting a convenient date for the call.

How our discovery call works:

Please wait while the page is loading
Current Progress
Current Progress

Complete Our Contact Form

Discovery Calls Scheduled

Receive a Tailored Proposal

Success message!
Warning message!
Error message!